# How to Source Custom Satellite Parts from U.S. Manufacturers

## TL;DR

- Define the drawing, intended use, and program requirements for your custom satellite brackets, housings, panels, mounts, or structural parts before requesting quotes.
- Vendra’s platform and mechanical engineers review part requirements, match the work with suitable U.S. manufacturers, and coordinate agreed production, inspection, documentation, and delivery. If sourcing directly or through a factory or network service, confirm who owns those handoffs.
- State whether the order supports a prototype, qualification build, or flight-intent part. Your drawing and program requirements determine supplier qualifications, inspection, and documentation. Manufacturing a part does not certify it for flight.
- Send the current drawing and CAD revision, material condition, quantities, required processes and records, and target delivery date with your RFQ.
- Already have manufacturers you trust? Keep those relationships. When their capacity is booked or a part needs different capabilities, Vendra can help identify another suitable U.S. manufacturer and coordinate the agreed work through delivery.

## What counts as a custom satellite structural part

Custom satellite structural parts include brackets, housings, panels, mounts, and other components made to your drawings. A bracket may secure an instrument to a frame, while a housing may support and protect electronics. Complete spacecraft and catalog subsystems fall outside this scope.

A satellite application alone does not set a part’s material, inspection, or handling requirements. Your drawing and applicable contract or program requirements define what the manufacturer must deliver. For example, [NASA-STD-6016](https://standards.nasa.gov/standard/nasa/nasa-std-6016) addresses spacecraft materials and processes when a program invokes it. 

## Define intended use and program requirements

Before you request quotes, identify the part’s intended use and the documents that govern the order. The drawing, purchase order, and applicable customer or program requirements establish the manufacturing, supplier qualification, inspection, and documentation requirements. A build label alone cannot establish them.

- **Prototype.** You may be checking fit or refining a design. State which drawing requirements, inspection checks, and records still apply.
- **Qualification.** You may need specified tests or records to demonstrate that a design or production process meets program criteria. Name the criteria and required evidence in the RFQ.
- **Flight-intent.** You need the applicable manufacturing and acceptance requirements for hardware intended for flight. Flight intent alone does not make [AS9102 first article inspection](https://iaqg.org/standard/9102-first-article-inspection-requirement/) mandatory or authorize the manufacturer to approve the part for flight.

For each order, provide the drawing and CAD revision, intended use, and applicable purchase-order and program requirements. Identify any required supplier credentials, material condition, inspection, traceability, and approval steps before you select a manufacturer. 

## Choose a sourcing model: managed partner, direct shop, or factory network

The right sourcing model depends on who can coordinate the work your satellite part requires. A machined housing may need coating and documented inspection, but you do not have to manage those steps yourself if a partner or lead shop agrees to handle them.



| Model | Manufacturer selection | Process handoffs | Inspection and records | Direct shop contact |
| --- | --- | --- | --- | --- |
| Managed partner | Partner assesses suppliers, and you select from suitable quotes | Partner coordinates agreed steps | Partner collects agreed records, while you set requirements | Available through Vendra, though access varies by provider |
| Direct U.S. specialist shop | You select the shop | Shop may manage subcontractors if agreed | Shop provides agreed inspection and records, including subcontractor records when in scope | Direct |
| Factory or network service | Service selects a factory or offers a choice, depending on the order | Confirm which steps the service manages | Confirm inspection scope and record availability before ordering | Depends on the service and order |



A managed partner suits buyers who need supplier matching and coordination across multiple operations. At Vendra, our software-assisted analysis and mechanical engineering review inform matching to U.S. manufacturers based on capability, capacity, and order requirements. We coordinate the agreed handoffs and documentation.

A direct U.S. specialist shop suits buyers who have found a shop with the right equipment, capacity, and experience for the part. Ask whether the shop will manage outside finishing and inspection or whether those handoffs remain yours.

A factory or network service suits buyers whose order fits a defined service offering. Confirm the manufacturing site, domestic production for your order, supplier visibility, and responsibility for records before choosing one. No model wins every order. For provider-level comparisons, see our [general aerospace partner comparison](https://vendra.io/resources/best-us-aerospace-defense-manufacturing-partners).

## Confirm manufacturer fit and data access before sharing files

Initial discussions can establish process needs, U.S. manufacturing requirements, and data-access restrictions. Detailed supplier matching follows review of the part files through the approved submission route. Ask any provider to name the manufacturer and confirm where each operation will occur. A provider’s network may include sites that will not work on your order.

Confirm who takes responsibility under the order for finishing, inspection, required records, and handoffs between sites. Ask who communicates approved revisions and resolves production or inspection issues. If the order requires a certified manufacturing site, check its current credentials and scope.

Some defense-article production drawings can be [ITAR technical data](https://www.ecfr.gov/current/title-22/chapter-I/subchapter-M/part-120/subpart-C/section-120.33). Before sharing controlled files, identify the intended recipients, restrict access to authorized people, confirm an approved transfer method, and establish each party’s applicable compliance obligations. An approved upload channel alone does not authorize access or transfer.

## Nail down material, finishing, and handling requirements

Specify the required material condition on the drawing or purchase order. For a machined bracket, that may mean naming the alloy, temper, and any required heat-treated condition. Include material or process restrictions imposed by the customer or program. A material callout alone may not tell the manufacturer which conditions or restrictions apply.

Finishing and contamination requirements also need explicit instructions. State the coating specification, surfaces to finish or mask, and any required finish records. If the order calls for cleanliness limits, approved cleaning methods, protective packaging, or special handling, include those requirements and the acceptance criteria. For example, [NASA-STD-6016](https://standards.nasa.gov/standard/nasa/nasa-std-6016) addresses controls to prevent damage or contamination during flight-hardware processing, packaging, and shipment.

Set traceability and testing requirements for the specific order. Identify which material lots must be linked to finished parts, which certificates must accompany delivery, and what tests the program requires. Before quoting, confirm who will perform finishing and testing, who will inspect the results, and who will provide the required records.

## Build inspection and documentation into the order, not after

Specify inspection and records in the order before production starts. A dimensional report records measurements against drawing requirements. [AS9102 first article inspection](https://iaqg.org/standard/9102-first-article-inspection-requirement/) verifies that production processes can produce a part meeting applicable engineering requirements, and its results go into a first article inspection report, or FAIR. Ongoing production inspection checks parts against the order’s acceptance criteria. None of these steps replaces customer acceptance.

Your customer, contract, program, and quality-system requirements determine whether AS9102 applies and which revision governs. State the required inspection scope, certificates, traceability records, and any submission or approval requirements in the RFQ. Our [detailed FAI guide](https://vendra.io/resources/as9102-first-article-inspection-aerospace-parts-rfq) covers the process and its documentation in more detail.

We coordinate agreed inspection records and deliverables. Decisions reserved by the program or contract remain with the designated customer authority.

## How Vendra sources satellite structural parts

**Best suited to** buyers who need custom satellite structural parts made in the United States and want a managed partner to coordinate manufacturing, inspection, and delivery.

We are a managed manufacturing and sourcing partner for U.S. hardware companies. You submit CAD files, drawings, quantities, and program requirements in an RFQ. Our platform analyzes the part requirements, and our mechanical engineers review the manufacturing and quality needs before matching the work to U.S. manufacturers based on capability, capacity, and order requirements. Vendra holds AS9100D certification and assesses the selected manufacturing site’s capabilities, credentials, and inspection resources against your order requirements. Every manufacturer in Vendra’s network is based in the United States.

You can see which manufacturer will make your parts and communicate directly with the shop if you choose. After you place an order, we coordinate agreed handoffs between processes, communicate approved revisions, track the schedule, and collect required inspection records through delivery. RFQs, quotes, production updates, and documentation stay in one platform, so you spend less time following up with separate suppliers.

In the [Reflect Orbital customer story](https://vendra.io/customers/reflect-orbital), we coordinated CNC machining, coating, and post-processing. Reflect Orbital’s Sean Li estimated that our work saved two to four days per month, per engineer, on sourcing and coordination. 

## RFQ checklist for custom satellite components

A complete RFQ helps manufacturers quote the full scope of your satellite component with fewer clarification rounds. Include:

- The drawing and CAD file with matching revision identifiers, intended use, applicable customer or program specifications, and any unresolved design details.
- The material specification, required material condition, and applicable restrictions.
- The quantity for each part and the target delivery date.
- Critical features and inspection criteria. All applicable drawing dimensions, tolerances, datums, and notes still apply.
- Required manufacturing processes, finishes, coatings, and post-processing.
- Inspection requirements, including sampling and AS9102 first article inspection if required, plus any mandated supplier or special-process approvals.
- Required material and process certificates, traceability, test records, and any customer or program document review or approval required before shipment.
- Cleanliness, handling, and packaging requirements that apply to the part.

You can still request a quote while resolving an open requirement. Identify it so the manufacturer can state any assumptions.

## FAQs

**Can the same bracket be ordered as a prototype and as flight-intent hardware?** Yes. Tell the manufacturer how you intend to use each order. The drawing and applicable customer or program requirements determine the required supplier qualifications, inspection, and records. Manufacturing the bracket does not certify it for flight.

**When do I need AS9102 first article inspection?** Check the applicable contract, program, customer, and quality-system requirements. When required, [first article inspection](https://iaqg.org/standard/9102-first-article-inspection-requirement/) verifies that production processes can produce a part meeting engineering requirements, with results documented in a first article inspection report. A dimensional report alone does not replace that process.

**Can a direct machine shop coordinate outside processes?** Yes. Ask whether the shop will manage subcontracted finishing, inspection, and records, and identify any handoffs you must coordinate.

**What finishing and handling details belong in the RFQ?** Include applicable coating specifications, masking, cleanliness limits, handling instructions, and packaging requirements. State any required certificates or tests. 

**Can I send satellite drawings through a secure upload link?** First determine whether the files contain controlled technical data. Certain production drawings can qualify as [ITAR technical data](https://www.ecfr.gov/current/title-22/chapter-I/subchapter-M/part-120/subpart-C/section-120.33). Before sharing controlled files, confirm authorized recipients, access restrictions, the approved transfer method, and each party’s applicable obligations. A secure link alone does not authorize a transfer.

## Submit an RFQ

Your satellite structural part needs a manufacturer whose qualifications match its intended use and program requirements. Our mechanical engineers review your drawings and requirements, then match the work to a U.S. manufacturer with the required capabilities, capacity, and credentials. [Submit an RFQ](https://vendra.io) with your drawings and requirements to start that review.